If you are planning a renovation or a new build, photorealistic renders are one of the smaller lines in the budget, and one of the few that can save money everywhere else. But prices online range so widely that it is hard to know what a fair quote looks like, or whether two quotes even describe the same service.
This guide explains what moves the price of a home rendering project, what a good quote should include, and how to tell whether rendering is worth it for your project. Our current prices are on our pricing page, in dollars and pounds, and every brief gets a fixed quote within 24 hours.
What you are paying for
Two very different services hide behind the words "3D rendering."
The first is rendering only. You send finished drawings and a complete specification: every material, fixture and piece of furniture. The studio builds the model and produces images of exactly that. It works well for architects and designers who have already made every decision.
The second is design and rendering. Most homeowners do not arrive with a finished specification. They arrive with a floor plan, a few photos of rooms they love and a list of questions. Here the studio works out the layout, materials, lighting and furniture with you, then renders the result. Every Studio 5 project includes the design work, so you finish with a room you have already thought through, and the pictures to show your builder.
When you compare quotes, check which of the two you are being offered. The second takes more hours, and saves you far more.
Five things that move the price
1. How many spaces
This is the biggest single factor. A primary bathroom is one space. A kitchen, dining and living area that share one open room is one larger space, and it has to work from every angle. A whole house is a coordinated set of rooms that share materials and light. Interior work is usually quoted per room, and whole-home projects are scoped as one package so the house reads as one house.
2. Interior or exterior
Exteriors bring the site into the picture: planting, neighboring buildings, terrain, sky and the time of day. They are usually priced by the size of the facade rather than by room, and they take longer. Our standard turnaround is 14 to 21 business days for interiors and 21 to 30 days for exteriors.
3. How finished the design is
A full set of drawings with a finishes schedule needs less design time than a sketch and a mood board. Neither is wrong. A hand-drawn plan is a perfectly good place to start, and we work from floor plans in any format every week. It just means more of the design happens with us.
4. Detail and number of views
Custom joinery, a particular stone with visible veining, a staircase that has to be modeled exactly, or a room that needs four views instead of two all add hours. Standard rooms with clear references take fewer.
5. Timeline and extras
Rush delivery, 360° panoramas, a walkthrough video, 2D drawings and a shopping list with links to every product are add-ons. You only pay for the ones your project needs.
What a good quote includes
Whoever you work with, a quote you can rely on answers these questions in writing:
- Is design included, or are you expected to supply every material and product?
- How many views of each room, and from where?
- How many revision rounds, and what counts as one? At Studio 5 a round means you collect your feedback, send it in one go, and every change is made together.
- What resolution? Ours are 4K at minimum, enough for print and presentations.
- Who can use the images? You should be free to show them to your builder, your lender and your friends. Our clients get full usage rights.
- What is not included, and what each extra costs before it starts.
- When is payment due? We book projects with a 60% deposit, with the rest due on delivery.
A fixed scope protects both sides. If a quote leaves these questions open, ask before you sign.
The cost of not seeing it first
The useful way to judge the price of a render is against the cost of the mistakes it catches.
Most renovation regrets are not about taste. They are about things nobody could see in time: an island that looked generous on paper and now crowds the walkway, a stone that was beautiful as a sample and reads cold across a long countertop, a window that frames the neighbor's wall instead of the garden, pendants hung at the wrong height over the table.
At render stage, changing any of these costs one revision round. On site, it costs a change order, a delay, and sometimes a second set of materials. On a kitchen or a bathroom, a single avoided mistake usually covers the rendering several times over.
At render stage a change costs a revision round. On site it costs a contractor's invoice.
There is a second saving that is harder to measure. When your builder, your partner and your designer are all looking at the same picture, decisions are made faster and with less back and forth. Contractors also price more accurately when they can see exactly what you expect.
Is it worth it for your project?
Rendering earns its fee most clearly when:
- the work is expensive per square foot, like kitchens, bathrooms and primary suites
- the space does not exist yet, as with extensions and additions and new builds
- more than one person has to agree: a couple, a family, a board, the neighbors
- you are choosing between two or three layouts and cannot picture the difference
It earns less on a like-for-like refresh where nothing moves and you already know exactly what you want. For a sense of what the decisions look like in a real project, our guide to seeing a kitchen before you build it walks through one room in detail.
How to get a quote
Send a short brief: what you are building or renovating, a floor plan or sketch (a phone photo is fine), photos of the existing space if it exists, and a few images of rooms you like. You get a scope and a fixed quote within 24 hours, with no obligation.
Frequently asked questions
How much does a 3D rendering of a house cost?
It depends on how many rooms are included, whether design is part of the service, and whether exteriors are needed. Studio 5 publishes its starting prices in US dollars and pounds sterling on its pricing page, and every project gets a fixed quote within 24 hours of the brief.
Do you charge per room or per project?
Interior work is quoted per room. Exteriors are quoted by the size of the facade. Multi-room and whole-home projects are quoted as one complete scope.
Is 3D rendering worth it for a renovation?
For kitchens, bathrooms, extensions and new builds, usually yes. One avoided mistake on site, such as an island that is too big or a material that reads wrong at full scale, typically costs more than the renders.
Are there hidden fees?
No. The quote covers everything in the agreed scope. Extra revision rounds, add-ons and changes to the scope are quoted and approved before any work on them begins.





