At some point in every addition, ADU or major remodel, someone says the words "permit drawings," and the project stops until you have them. For most homeowners it is the least familiar part of the process: you know what you want to build, but not what the building department wants to see, who is allowed to draw it, or why the first submission so often comes back with comments.
This guide explains what goes into a typical residential permit set in the United States, who can prepare one, and how to use the same drawings to get better quotes from contractors.
What a permit set is for
A permit set is the package of drawings and documents your building department reviews to confirm that the work meets the building code and the zoning rules for your lot. Once approved, it is also the set the inspector checks the work against on site. That second job is the one homeowners forget: the drawings are not only a hurdle to clear, they are the agreed description of what will be built.
What is usually in it
Every jurisdiction publishes its own checklist, and a small interior remodel needs far less than a new addition. For an addition or an ADU, a typical residential set includes:
- Cover sheet: the address, the scope of work, the applicable codes, the lot and building areas, and an index of sheets.
- Site plan: property lines, setbacks, the existing house, the new work, driveways, easements and sometimes drainage and utilities.
- Existing and proposed floor plans: walls, doors, windows, room names, dimensions, and what is being removed.
- Exterior elevations: each face of the building with heights, roof pitches, windows and materials.
- Building sections: a cut through the building from foundation to roof, showing ceiling heights, insulation and how it is built.
- Structural information: foundations, framing, beams and headers, often with an engineer's calculations.
- Electrical, mechanical and plumbing information where the department asks for it, from a basic outlet and lighting layout to full plans.
- Energy compliance: forms or calculations showing the insulation and windows meet your state's energy code.
- Details and notes that tie it together: stair dimensions, guardrails, fire separation, smoke and carbon monoxide alarms.
Who can prepare the drawings
This is the question with the most local variation. Many US jurisdictions allow a homeowner, a building designer or a drafter to prepare drawings for a single-family home within certain limits. Structural changes, such as removing a bearing wall, adding a story or building on difficult soil, usually need calculations or drawings stamped by a licensed engineer. Some states require a licensed architect above a certain size or for certain types of building.
Your building department will tell you exactly what it accepts, and it is worth asking before you start.
Studio 5 prepares permit drawing sets for homeowners, alongside the design and the renders. Where your building department requires a licensed architect's or engineer's stamp, we work alongside them, so the stamped set and the design you approved are the same thing. You can read more about this and our other services for homeowners in the US.
Plan review: what sends drawings back
Very few sets are approved without a single comment, and a round of corrections is a normal part of the process. The most common reasons drawings come back are:
- dimensions or setbacks that are missing or do not add up
- a scope of work that is unclear about what is new and what exists
- structural information that is incomplete
- energy forms that are missing or do not match the drawings
- sheets that contradict each other, such as a window that appears on the plan but not on the elevation
Review times range from days to months depending on the city and the season. Clear, consistent drawings are the most reliable way to shorten them.
Same drawings, better quotes
Here is the part that pays for the drawings twice. Contractors can only price what they can see. When the drawings are vague, every bidder fills the gaps with their own assumptions and adds allowances to cover the risk, and the quotes you get back are impossible to compare.
When every bidder prices the same complete set, with a finishes schedule and a few renders showing what the finished rooms should look like, the quotes describe the same project. The differences between them are real differences in price and approach, and fewer surprises turn into change orders later.
Contractors price what they can see. Show them the same thing and the quotes become comparable.
Renders alongside the drawings
Technical drawings are written for builders and inspectors. Most of the other people with a say in your project read pictures far more easily:
- HOA design review boards, which often ask for materials and colors along with elevations
- neighbors, who are much more relaxed about a new addition when they can see it
- lenders and appraisers on a construction loan
- your family, who will live with the result
When the drawings and the renders come from the same 3D model, they cannot disagree. What the board approves is what the inspector sees, and what your family fell in love with is what gets built. If you are planning a backyard unit, see our guide to ADU design, and for the space you are adding to the house, our guide to additions.
Frequently asked questions
Do I need an architect to get a building permit?
Not always. Many US jurisdictions accept drawings for a single-family home from a homeowner, building designer or drafter within certain limits. Structural work usually needs a licensed engineer, and some states require an architect for larger projects. Your building department publishes what it accepts.
What drawings are needed for a home addition permit?
Usually a site plan, existing and proposed floor plans, exterior elevations, building sections, structural information, and energy compliance forms, plus electrical or plumbing information where your department asks for it.
Can I draw my own permit drawings?
In many places, yes, for your own single-family home, provided the drawings are complete and any structural elements are designed by a licensed engineer where required. Check your building department's rules before you start.
How long does a permit review take?
It varies widely, from days for a small remodel in some cities to several months for an addition in busy ones. Complete, consistent drawings reduce the number of correction rounds, which is usually where the time goes.